Heating

With the windows and ceiling now installed, it was time to address the very high heating cost for the hall. Single glazed windows and poor roof insulation, electric wall convector heating was the highest cost to the management of the hall. Winter, the heating had to be on 4-5 hours before the hall could be used and it did not retain the heat when in use. Researching other halls, it was agreed to install Inferred heating panels in the ceiling,  different areas  can be managed using zone areas. For the first time, the kitchen and alcove now has heating. Toilets heating was upgraded.